Cisco Systems SF300-24P Manuel d'utilisateur Page 101

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 483
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 100
7
Cisco Small Business 300 Series Managed Switch Administration Guide 84
Administration: Diagnostics
This section contains information for configuring port mirroring, running cable
tests, and viewing device operational information.
It covers the following topics:
Testing Copper Ports
Displaying Optical Module Status
Configuring Port and VLAN Mirroring
Viewing CPU Utilization and Secure Core Technology
Testing Copper Ports
The Copper Test page
displays the results of integrated cable tests performed on
copper cables by the Virtual Cable Tester (VCT).
VCT performs two types of tests:
Time Domain Reflectometry (TDR) technology tests the quality and
characteristics of a copper cable attached to a port. Cables of up to 140
meters long can be tested. These results are displayed in the Test Results
block of the Copper Test page.
DSP-based tests are performed on active GE links to measure cable length.
These results are displayed in the Advanced Information block of the
Copper Test page.
Preconditions to Running the Copper Port Test
Before running the test, do the following:
(Mandatory) Disable Short Reach mode (see the Port Management > Green
Ethernet > Properties page)
Vue de la page 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 482 483

Commentaires sur ces manuels

Pas de commentaire