Cisco Systems 4xGBE Guide de l'utilisateur Page 100

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 152
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 99
Chapter 6 Cabling the Line Ports and Completing the Installation
Connecting the line ports to the network
SCE 2000 4xGBE Installation and Configuration Guide
6-6 OL-7824-02
Inline topologies require connecting both Receive and Transmit fibers to the SCE 2000. Cascade
ports always require both Receive and Transmit fibers to be connected.
The following diagram illustrates the connections for a dual link, two SCE 2000-platform inline
topology.
Figure 6-5: Cabling Diagram: Dual Link Inline Topology Two Cascaded SCE 2000s
Vue de la page 99
1 2 ... 95 96 97 98 99 100 101 102 103 104 105 ... 151 152

Commentaires sur ces manuels

Pas de commentaire